Bubshait, A A and Cunningham, M J (1998) Comparison of Delay Analysis Methodologies. Journal of Construction Engineering and Management, 124(04), 315–22.

Chao, L and Skibniewski, M J (1998) Fuzzy Logic for Evaluating Alternative Construction Technology. Journal of Construction Engineering and Management, 124(04), 297–304.

Faniran, O O, Oluwoye, J O and Lenard, D J (1998) Interactions between Construction Planning and Influence Factors. Journal of Construction Engineering and Management, 124(04), 245–56.

Garza, J M d l, Hancher, D E and Decker, L (1998) Analysis of Safety Indicators in Construction. Journal of Construction Engineering and Management, 124(04), 312–4.

Harmelink, D J and Rowings, J E (1998) Linear Scheduling Model: Development of Controlling Activity Path. Journal of Construction Engineering and Management, 124(04), 263–8.

Harris, R B and Ioannou, P G (1998) Scheduling Projects with Repeating Activities. Journal of Construction Engineering and Management, 124(04), 269–78.

LeBlond, D, Owen, F, Gibson, G E, Haas, C T and Traver, A E (1998) Control Improvement for Advanced Construction Equipment. Journal of Construction Engineering and Management, 124(04), 289–96.

Moon, S and Bernold, L E (1998) Graphic-Based Human-Machine Interface for Construction Manipulator Control. Journal of Construction Engineering and Management, 124(04), 305–11.

Tabatabai-Gargari, M and Elzarka, H M (1998) Integrated CAD/KBS Approach for Automating Preconstruction Activities. Journal of Construction Engineering and Management, 124(04), 257–62.

Tommelein, I D (1998) Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique. Journal of Construction Engineering and Management, 124(04), 279–88.

Toole, T M (1998) Uncertainty and Home Builders' Adoption of Technological Innovations. Journal of Construction Engineering and Management, 124(04), 323–32.

Wang, S Q, Tiong, R L K, Ting, S K, Chew, D and Ashley, D (1998) Evaluation and Competitive Tendering of BOT Power Plant Project in China. Journal of Construction Engineering and Management, 124(04), 333–41.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1998)124:4(333)
  • Abstract:
    The tremendous economic growth in China has resulted in an immense demand for basic infrastructure like roads, ports, and power generation facilities. There are thus many investment opportunities for foreign investors. At the same time, some innovations have also been introduced in procurement practices. For example, the build-operate-transfer (BOT) scheme, open competitive bidding, and fully foreign ownership were adopted at the end of 1996, when the concession of the first state-approved BOT project, the Laibin B power plant project in Guangxi Province, was awarded. It is important, therefore, for foreign investors to understand the current regulations, approval procedures, and evaluation and competitive tendering of privatized infrastructure projects by the government-approved BOT project agents in China, in order to secure concession contracts and manage the associated project risks well. This paper discusses these innovations, the roles of the BOT project agents, and the evaluation and competitive tendering of BOT projects in China based on the Laibin B power plant project. The lessons for investing in future similar BOT projects in China are also drawn.